Portland Port Authority – Portland, Victoria

Portland, Victoria Hydro-demolition of defective concrete and Gunite re-instatement for berth 5 crane rail beam and berth 6 deck soffit and beams.
BMA Hay Point Coal Terminal (Berth 1) – Hay Point/Mackay, Queensland

Hay Point, Queensland Hydro-demolition of deck soffit area on berth 1 trestle to expose A and B layer of reinforcement bar and remove all defective concrete.
Townsville Port Authority – Townsville, Queensland

Townsville, Queensland Surface preparation of bollards on Berth 1 Port of Townsville to remove corrosion and Epoxy two pack paint at 1000 microns to achieve a HP 2.5 Blast or (equivalent to S.A 2.5 Blast ) operating at 40,000 P.S.I water pressure.
Maryborough Water Treatment Plant – Maryborough, Victoria

Maryborough, Victoria Hydro-Demolition of external concrete surface areas subjected to chlorine and chemical attack. Abrasive blasting & protective coating of reinforcement bars, sacrificial anode installation and gunite spraying.
QGC Water Trunk Main – Chinchilla, Dalby, Queensland

Chinchilla, Dalby, Queensland Cement lined Tyco 976mm OD Pipe. Cutting using abrasive injection abject cutting nozzle & tracking system.
Various Gunite Repair Projects – Cairns, Townsville, Mackay & Gladstone Queensland

Project: Various Gunite repair projects including Hydro-Demolition of concrete beams, soffits & piles in various locations including Cairns, Townsville, Gladstone and Mackay.
Fortescue Metals Group, Iron Ore Mine – Pilbara Region, Western Australia

Pilbara Region, Western Australia Hydro-Demolition of delaminated and defective concrete from the secondary crushing plant plinth bases, 200 square meters of concrete removal.
BHP Billiton Mitsubishi Alliance Coal Conveyor Pilon Support Structure – Moranbah, Queensland

Caval Ridge, Moranbah, Queensland Hydro-Demolition of defective honey combed concrete from two support piles from the coal loading conveyor system.
AGL Loy Yang Power Station – Gippsland, Victoria

Traralgon, Gippsland, Victoria Reconstruction of Pulverisation Mill Base including: Hydro-demolition of defective concrete Reinforcement bar replacement Installation of formwork Heat resistant grout pouring