Townsville Port Authority – Townsville, Queensland

40,000 P.S.I water pressure

Townsville, Queensland Surface preparation of bollards on Berth 1 Port of Townsville to remove corrosion and Epoxy two pack paint at 1000 microns to achieve a HP 2.5 Blast or (equivalent to S.A 2.5 Blast ) operating at 40,000 P.S.I water pressure.

AGL Loy Yang Power Station – Gippsland, Victoria

Hydro Demolition Gippsland Victoria

Traralgon, Gippsland, Victoria Reconstruction of Pulverisation Mill Base including: Hydro-demolition of defective concrete Reinforcement bar replacement Installation of formwork Heat resistant grout pouring